Install Site requirements.
What does the customer need to supply?
Explained below.
Customer supplied items:
Our machines are delivered by curtain side van or lorry, depending on model and size ordered.
for 8*4 size machines: (2512)
Forklift with 2 ton plus capacity, 1.8m fork extensions or equivalent tine length are required to offload.
for 10*5 machines (3015)
Forklift with 2.5 ton plus capacity, 2.4m fork extensions or equivalent tine length.
for JUMBO (3020) size machines:
Forklift with 3.5 ton plus capacity, 2.4m fork extensions or equivalent tine length.
We can loan our extensions + some machine skates to you. to be loaded with your machine. Customer returns to us.
(Hiab crane lorry can be ordered to deliver at extra cost to the customer. cost depends on distance)
The delivery area & siting area should be totally clear of obstacles.
Machine Power Requirements:
If you have chosen to purchase a 3 phase supply machine:
3 phase Electric supply. ( fitted & tested by qualified electrician):
32 Amp (5 pin with Neutral) switch isolated outlet sockets. supplied from 32amp C curve breaker in the distribution board.
Also. Matching plugs with Minimum diameter 4mm x 5Core Rubber Cable Flex H07RN-F cable tails attatched (Long enough to reach neatly from socket to underside centre of the machine frame, or control box power input)
Must have Neutral wire !
*** New regulations stipulate that any SOCKET must now be supplied by RCBO protected supply at the main supply board ***

& 
Or preferred method: wall mounted hard wired isolation switch. Plus Cable tail with same spec as above.

Either of the above isolation supplies to be fitted easily accessible when the machine is in place.
If you have chosen to purchase a SINGLE PHASE machine:
Single phase Electric supply. ( fitted by qualified electrician):
32 Amp single phase switch isolated socket outlet. Power feed from 32 amp C curve breaker in the distribution board. More than 1 may be required depending on machine specification.
*** New regulations stipulate that any SOCKET must now be supplied by RCBO protected supply at the main supply board ***
This is to be fitted easily accessible when the machine is in place.

& 
Also. Matching plugs with Minimum diameter 4mm x 3Core Rubber Cable Flex H07RN-F cable tails attatched (Long enough to reach neatly from socket to underside centre of the machine frame, or control box power input)
Or: preferred method: wall mounted hard wired isolator plus Cable tail of the same specification as above.

VACUUM PUMPS :
Should be switched and powered by a wall mounted DOL Starter.
Dol starter should be easily accessible from operator area to frequently stop/start the pumps.
One starter per pump so they can be started independantly.
Fitted with overload to suit the motor power chosen.
7.5kw 3 phase=18 amp overload
11kw 3 phase=25 amp overload
4mm /6mm diameter core minimum cable tail. 4 core , no neutral required. 32a C type breaker feed supply.
Pumps site behind rear of the machine.
&
ATC machines require a compressed air supply.

A good quality air regulator/ filter with 5 micron filter.
Fitted with input shut off valve. Outlet 8mm push fit outlet pipe fitting to connect to supplied 8mm o.d machine inlet pipe.
This is to be fitted close to the machine and easily accessible when the machine is in place.
You can order one of these from us to fit before machine delivery.
Please note: ATC spindle machines require a 100psi MINIMUM constant clean dry compressed air supply.
10 cfm +
Air Compressor required:
Workshop compressor idealy should have a built in or add on air drier supplying class 1 air.
recommend hydrovane or screw type compressor for low noise/ long life.
Any compressor must have minimum 50 litre air tank
MUST be set to switch on at minimum 100psi.
Compressor pressure setting MUST be done and tested BEFORE machine delivery.
youtube shows how to set pressure and differential !
Tool change will not be allowed if input pressure drops below 85psi
Very important. Any compressor tank must either have AUTOMATIC drain or at minimum a manual drain tap to drain all tank moisture DAILY before use.
Dust extraction:
If using existing site extractor:
Piping to above the machine to the side. with enough 100mm or 150mm depending on model ordered ,inside diameter metal coil flex pipe to access the complete machine footprint. For best static build up / discharge protection the pipe metal inner coil should be Earth bonded.
Operation PC for vectric sofware and machine control software:
Windows 10 / 11 pc to run vectric design cad.cam & machine control software. ( ethernet cat5 network socket required)
if pc has usb c only, an ethernet adapter must be customer supplied.